GE Power to lead EPC contract for Ostroleka C

13 April 2018

GE Power was informed that it has been chosen as the lead EPC, in consortium with Alstom Power Systems, to build the ultra-supercritical (USC) coal power plant Ostroleka C in Poland. The plant will start commercial operation within 56 months after the notice to proceed and generate a gross output of 1,000 MW, enough to power 300,000 homes in Poland.

GE Power will design, manufacture and deliver its market-leading ultra-supercritical technology components (boiler and steam turbine generator) for this new power plant. With USC technology, the plant will perform to the highest efficiency level possible for a steam power plant in Poland with 46% efficiency, well above the global average of 33% efficiency. GE Power will also provide advanced environmental control systems such as electrostatic precipitators and wet flue gas desulfurization plant. These technologies ensure Ostroleka C will meet the most stringent emission requirement as called for by the latest European Union directive.

GE’s EPC expertise comes from more than 100 GW installed through 200 integrated projects.

Printer friendly Printer friendly
Tip editor Tip editor
Like

Back to the news archive...

top
  bottom
KCI Publishing Copyright © 2018 - Disclaimer - Privacy statement
 
YouTube Twitter LinkedIn Facebook KCI World Webshop